Traeth Mawr Viaduct Restoration Project

Tackling a significant timber replacement scheme while battling the elements both underwater and above it made easier with innovative jacking system that was mounted ahead of work..

Cowley Bridge Flood Alleviation

Suffering significant disruption with sporadic flooding over several years, AmcoGiffen improved the flood resilience in and around Exeter’s Cowley Bridge Junction area.

Severn Tunnel OLE

AmcoGiffen were contracted to provide the installation of all Overhead Line Equipment (OLE) in the tunnels from Bristol Patchway to Cardiff.

Lamington Viaduct

As a four span 101-metre bridge, the Lamington Viaduct is the largest of 4 west coast mainline carrying railway bridges that crosses the river Clyde.

Pont-y-pant Emergency Works

With storm Doris causing considerable damage across Wales, AmcoGiffen were selected to restore the line and surrounding areas to operational safety.