Midland Mainline London to Corby Line
Throughout CP5 and into CP6 we completed 17 overbridge re-constructions and ten parapet interventions for route clearance along the Midland Mainline (MML) project footprint for the electrification programme..
Loughborough Station roof restoration
The historic Grade II listed Loughborough Station has been topped and tailed recently with extensive work to repairs the aging and leaking roof as part of a heritage investment project..
Traeth Mawr Viaduct Restoration Project
Tackling a significant timber replacement scheme while battling the elements both underwater and above it made easier with innovative jacking system that was mounted ahead of work..

Thameslink Platform Level Access
Collaborating with Network Rail and Thameslink, we provided the installation of platform level access humps adjacent to the middle Class 700 carriages across core Thameslink stations.

ECML Power Upgrades
We're installing new signalling power supplies at all interlockings on the East Coast Main Line (ECML) between Edinburgh and Berwick.

Merseytravel Platform Enhancements
As a key part in the vital upgrades that are being carried out on almost 100 Merseyrail platforms, we're getting the network ready for new state of the art trains and their ‘sliding step’ technology.

Cowley Bridge Flood Alleviation
Suffering significant disruption with sporadic flooding over several years, AmcoGiffen improved the flood resilience in and around Exeter’s Cowley Bridge Junction area.

M8 Gantries Refurbishment
AmcoGiffen refurbished four of the distinctive overhead signage gantries on the M8 through Glasgow City Centre.

Severn Tunnel OLE
AmcoGiffen were contracted to provide the installation of all Overhead Line Equipment (OLE) in the tunnels from Bristol Patchway to Cardiff.

Glasgow Road Underbridge Replacement
AmcoGiffen were contracted to construct and install 2 nonstandard U-deck composite bridge decks..

River Witham
AmcoGiffen were contracted to deliver the replacement of a 4 span weight restricted underbridge which crosses the river Witham and adjacent highways in the centre of Lincoln.

Standedge Tunnel End
AmcoGiffen were contracted to provide the removal of a ‘life-expired’ wrought iron aqueduct deck, spanning the existing railway infrastructure.